Continuous long-term operation of ECG and TENS electrode automatic production lines will cause gradual wear of transmission, gluing, die-cutting and sensing components. Timely standardized maintenance and regular replacement of vulnerable parts can effectively reduce equipment downtime, stabilize finished product yield and extend the overall service life of the machine. This article unifies daily, weekly, quarterly and annual maintenance operations and standardized replacement cycle of all core wear parts.
After daily shutdown, wipe the glue dispensing head, roller surface and die-cut mold surface with special alcohol cleaning cloth to solidify hydrogel residue, prevent long-term glue buildup from causing uneven coating and electrode burr defects.
Check conveyor belt tension for deviation, clean surface dust, add a small amount of food-grade lubricating oil to guide roller bearings.
Restart control system to clear temporary parameter deviation, test tension sensor and photoelectric switch induction sensitivity.
Dismantle glue valve for full disassembly cleaning, remove internal dried gel blockages
Check all wire harness connectors for looseness and oxidation
Calibrate the substrate feeding horizontal correction device
Clean the air compressor filter element and drain water storage tank
Complete full machine precision calibration every three months, including gel thickness tolerance, die cutting size tolerance, snap riveting pressure, and record all calibration data for equipment maintenance archives.
Dismantle the main transmission box to replace aging lubricating grease, check servo motor operating current, inspect cylinder sealing rings for air leakage, and replace aging plastic pipelines.
Normal continuous production 800,000 to 1,000,000 pcs; replace when obvious burrs appear on electrode edges.
Gasket: replace monthly; integral glue valve core assembly replace every 6 months to avoid glue leakage and uneven coating.
Stable service cycle 12 months, replace when induction delay and feeding deviation frequently occur.
Replace every 4 months after surface wear and glue adhesion cannot be cleaned.
Sealing ring half-year replacement, plastic gas pipe annual replacement to prevent air leakage affecting riveting pressure.
Temperature sensing probe replace every 10 months, heating rod replace every 18 months.
Factories with single production line can reserve one set of full vulnerable parts for emergency replacement; multi-line mass production workshops shall maintain 2-3 sets of spare molds, glue valves and sensors to avoid production shutdown caused by sudden component damage.
Strict implementation of layered maintenance and regular replacement of wear parts is the core guarantee for stable and long-term operation of electrode production equipment, effectively reducing production loss caused by sudden machine failure and lowering long-term factory equipment investment cost.